EPS Room 102 Lobby Renovation
Start:1/04 Const:3/09 End: 4/09
The $2.5M EPS Lobby Renovation was designed to provide a gathering place for students, with interactive video displays of various engineering disciplines.
Architect: | Contractor: |
---|---|
CTA | Spring Corporation |